Mobile Power Generation Pack Installation

Dismantling of 7 mobile trailer power generation units in Norway, transportation to Turkey, and complete installation and commissioning at Ambarlฤฑ with 2-year operation and maintenance services.

Total Capacity
7 x 25
MW mobile power units
Total Power
175
MW combined output
Installation
Ambarlฤฑ
Facilities in Turkey
O&M Support
2 Years
Full operation and maintenance

โšก Project Overview

This landmark project involved the strategic dismantling, international transportation, and complete commissioning of 7 mobile power generation trailer units. The units were dismantled in Norway, transported across Europe to Turkey, and installed at the Ambarlฤฑ facilities for immediate power generation capabilities.

Seaway Energy provided comprehensive installation, commissioning, and 2-year operation and maintenance services, ensuring seamless power generation and optimal system performance throughout the contract period.

๐Ÿ”ง
Dismantling
Complete professional dismantling of all 7 units in Norway with careful documentation
๐Ÿšš
Transportation
International logistics and safe delivery from Norway to Turkey
๐Ÿ—๏ธ
Installation
Complete assembly and integration at Ambarlฤฑ facilities
โœ“
Commissioning
Full cold and hot commissioning with complete system testing
๐ŸŽ›๏ธ
Automation
SCADA systems and control software implementation
๐Ÿ“ก
O&M Services
2 years of comprehensive operation and maintenance support

๐Ÿ“Š Technical Specifications

ParameterSpecification
Unit TypeMobile Power Generation Trailers
Number of Units7 identical units
Power per Unit25 MW
Total Capacity175 MW
Installation LocationAmbarlฤฑ Facilities, Turkey
OriginNorway
Fuel TypeNatural Gas
Operation & Maintenance2-year comprehensive contract
Project ScopeDismantling, transportation, installation, commissioning, O&M
Control SystemsSCADA with remote monitoring capability

๐Ÿ—๏ธ Scope of Work

Seaway Energy delivered a complete turnkey solution from dismantling through 2 years of operational support:

๐Ÿ”ง
Dismantling in Norway
Professional dismantling of all 7 units with careful handling and documentation
๐Ÿ“ฆ
Transportation Logistics
Safe international transport from Norway to Turkey
๐Ÿ—๏ธ
Installation Works
Complete assembly at Ambarlฤฑ with foundation and infrastructure prep
๐Ÿ”Œ
Electrical Integration
Complete LV-MV electrical systems and grid connection
๐ŸŽ›๏ธ
System Commissioning
Cold and hot commissioning with full system validation
๐Ÿ”„
Operation & Maintenance
2-year O&M contract with 24/7 support and fault response