FSRU LNG Terminal - Hatay Dรถrtyol

Advanced Floating Storage Re-gasification Unit with complete electrical, mechanical, and SCADA systems implementation for modern LNG infrastructure.

Vessel Length
345m
Overall length of FSRU vessel
Storage Capacity
263,000
Cubic meters of LNG
Daily Capacity
21M
Cubic meters gas send-out
Location
Turkey
Hatay Dรถrtyol Port

โšก Project Overview

The FSRU LNG Terminal at Hatay Dรถrtyol represents a landmark achievement in modern energy infrastructure. This Floating Storage Re-gasification Unit combines cutting-edge technology with advanced automation systems to ensure efficient LNG operations at a strategic Mediterranean location.

Seaway Energy's comprehensive implementation included all electrical, mechanical, and electromechanical systems, along with complete SCADA integration for real-time monitoring and control of regasification operations. The project demonstrates our capability to deliver complex, large-scale energy infrastructure solutions.

๐Ÿ”Œ
Electrical Systems
Complete LV-MV electrical infrastructure with power distribution and protection systems
โš™๏ธ
Mechanical Integration
Long-distance cable pulling, tray installation, and mechanical assembly work
๐Ÿ“ก
SCADA Systems
Real-time monitoring and control of regasification and send-out operations
๐ŸŒ
Port Infrastructure
Port lighting and lightning protection material supply and installation
โœ“
Quality Assurance
Complete testing, commissioning, and operational readiness verification
๐Ÿš€
Operational Support
24/7 monitoring and support for continuous LNG operations

๐Ÿ“Š Technical Specifications

Parameter Specification
Vessel Type Floating Storage Re-gasification Unit (FSRU)
Overall Length 345 meters
LNG Storage Capacity 263,000 cubic meters
Daily Send-Out Capacity 21 Million cubic meters of natural gas
Location Hatay Dรถrtyol Port, Turkey
Project Scope Electrical, mechanical, electromechanical systems & automation
Cable Installation Long-distance cable pulling with optional tray installation
Port Infrastructure Lighting and lightning protection systems
Control Systems SCADA with real-time monitoring and automated control
Strategic Goal Reduce dependency on foreign energy sources

๐Ÿ—๏ธ Scope of Work

Seaway Energy delivered comprehensive engineering and implementation services for the FSRU LNG Terminal project:

โšก
Electrical Works
All short-term electrical installation, distribution systems, and power infrastructure
๐Ÿ”ง
Mechanical Works
Mechanical installation, alignment, and integration with vessel systems
โš™๏ธ
Electromechanical
Combined electrical and mechanical systems integration and testing
๐ŸŽ›๏ธ
Automation
SCADA system implementation and automation software configuration
๐Ÿ”Œ
Cable Systems
Long-distance cable pulling and optional cable tray installation works
๐Ÿ’ก
Port Facilities
Port lighting and lightning protection material supply and installation

Have an Energy Project in Mind?

Let Seaway Energy help you deliver world-class energy infrastructure solutions with proven expertise and technical excellence.