Birecik-Nizip Hydroelectric Power Plant Rehabilitation

Large-scale 690 MW hydroelectric facility rehabilitation with advanced SCADA/DCS systems, 154kV and 380kV electrical feeder revisions, comprehensive cybersecurity, and modern control room design.

Unit Configuration
6 x 115
MW generating units
Total Output
690
MW power generation
Electrical System
154kV + 380kV
Transmission lines revised
Scale
Large
Major infrastructure project

🌊 Project Overview

Birecik-Nizip Hydroelectric Power Plant rehabilitation represents one of the largest energy modernization projects. This 690 MW facility underwent complete automation rehabilitation with advanced SCADA/DCS systems, comprehensive electrical infrastructure revisions at both 154kV and 380kV transmission levels, cybersecurity implementation, and modern control room design.

Seaway Energy's execution demonstrates capability to manage complex, large-scale energy infrastructure projects with seamless grid integration and operational excellence.

πŸŽ›οΈ
SCADA/DCS Systems
Advanced automation for managing 6 large generating units
⚑
154kV Revision
Complete medium voltage distribution system upgrade
⚑
380kV Revision
High voltage transmission line modernization
πŸ”’
Cybersecurity
Comprehensive protection of critical energy infrastructure
πŸ–₯️
Control Room
Modern operator interface with advanced monitoring capabilities
🌐
Grid Integration
Seamless connection to national power grid

πŸ“Š Technical Specifications

ParameterSpecification
Plant TypeHydroelectric Power Plant
Number of Units6 generating units
Unit Capacity115 MW each
Total Capacity690 MW
Project ScopeComplete rehabilitation and modernization
Control SystemsSCADA/DCS with real-time monitoring
154kV SystemComplete feeder revision and upgrade
380kV SystemTransmission line modernization
SecurityAdvanced cybersecurity architecture
Grid ConnectionNational grid integration with modern protocols

πŸ—οΈ Scope of Work

πŸ”§
System Dismantling
Safe removal of legacy automation and electrical systems
πŸŽ›οΈ
SCADA/DCS Installation
Advanced control system implementation for all units
⚑
Electrical Revisions
154kV and 380kV systems upgrade and modernization
πŸ”’
Cybersecurity
Comprehensive security architecture for critical infrastructure
πŸ–₯️
Control Room Design
Modern operator workstations and monitoring systems
βœ“
Commissioning
Comprehensive testing and operational readiness validation

Looking for Large-Scale HPP Modernization?

Seaway Energy delivers comprehensive large-scale hydroelectric rehabilitation with world-class automation and electrical integration.