Birecik-Nizip Hydroelectric Power Plant Rehabilitation

Large-scale 690 MW hydroelectric facility rehabilitation with advanced SCADA/DCS systems, 154kV and 380kV electrical feeder revisions, comprehensive cybersecurity, and modern control room design.

Unit Configuration
6 x 115
MW generating units
Total Output
690
MW power generation
Electrical System
154kV + 380kV
Transmission lines revised
Scale
Large
Major infrastructure project

🌊 Project Overview

Birecik-Nizip Hydroelectric Power Plant rehabilitation represents one of the largest energy modernization projects. This 690 MW facility underwent complete automation rehabilitation with advanced SCADA/DCS systems, comprehensive electrical infrastructure revisions at both 154kV and 380kV transmission levels, cybersecurity implementation, and modern control room design.

Seaway Energy's execution demonstrates capability to manage complex, large-scale energy infrastructure projects with seamless grid integration and operational excellence.

🎛️
SCADA/DCS Systems
Advanced automation for managing 6 large generating units
154kV Revision
Complete medium voltage distribution system upgrade
380kV Revision
High voltage transmission line modernization
🔒
Cybersecurity
Comprehensive protection of critical energy infrastructure
🖥️
Control Room
Modern operator interface with advanced monitoring capabilities
🌐
Grid Integration
Seamless connection to national power grid

📊 Technical Specifications

ParameterSpecification
Plant TypeHydroelectric Power Plant
Number of Units6 generating units
Unit Capacity115 MW each
Total Capacity690 MW
Project ScopeComplete rehabilitation and modernization
Control SystemsSCADA/DCS with real-time monitoring
154kV SystemComplete feeder revision and upgrade
380kV SystemTransmission line modernization
SecurityAdvanced cybersecurity architecture
Grid ConnectionNational grid integration with modern protocols

🏗️ Scope of Work

🔧
System Dismantling
Safe removal of legacy automation and electrical systems
🎛️
SCADA/DCS Installation
Advanced control system implementation for all units
Electrical Revisions
154kV and 380kV systems upgrade and modernization
🔒
Cybersecurity
Comprehensive security architecture for critical infrastructure
🖥️
Control Room Design
Modern operator workstations and monitoring systems
Commissioning
Comprehensive testing and operational readiness validation