Istanbul Natural Gas Combined Cycle Power Plant represents one of the largest and most complex energy infrastructure projects executed by Seaway Energy. This flagship 1,350 MW facility with 15 generating units showcases our capability to manage massive-scale energy systems with advanced automation controlling approximately 20,000 I/O points.
The project included comprehensive DCS system implementation, predictive maintenance infrastructure, fault analysis capabilities, and extensive training of 20+ local engineers to ensure sustained operational excellence and technology transfer. The newly established DCS system enables predictive maintenance, minimizes unnecessary shutdowns through intelligent alarm systems, and ensures optimal plant efficiency.
